Road Construction and Delays
2015 Scheduled Road Construction
Reference the numbered dots and map below to see where road construction is scheduled. Check here for current road status.
Road construction zone 1
Norris to Mammoth (Norris to Golden Gate):
April 17 to October 1, expect traffic delays up to 30 minutes.
Road construction zone 2
Old Faithful to West Thumb (Craig Pass—Isa Lake Bridge Bridge Replacement:
June 11 through September 10: expect traffic delays up to 30 minutes. (Visitors are able to access Lone Star Geyser on the west side and DeLacy Creek trailhead on the east side.)
Road construction zone 3
North Entrance at Gardiner MT:
Excavation continues along the entrance road through Gardiner. Businesses are open. Traffic is being diverted to new alignments. Visitors are still able to stop at Roosevelt Arch using the flagger escort.
Road map with 2015 construction details.
Warning
Motorcyclists are advised to slow down and use extreme caution on loose gravel in construction areas.